ImplementedREALFIELD 03

NEXUS CEREBRI / Deterministic Planning Field

Search a declared grid, then say exactly what was proven.

The current planner performs bounded single-event grid search and ranks feasible candidates deterministically.

TECHNICAL DEPTH / CONTRACTS

PROVEN_OPTIMAL is only valid after the declared grid is fully traversed with a solution. Candidate limits can reduce the assessment to BEST_FOUND.

RESEARCH DEPTH / BOUNDARY

Bounded recurrence compilation, dependency/cycle evidence, composed hard constraints and explicit ordering keys are implemented. Joint repair and broader release validation remain future work.

BOUNDED DETERMINISTIC SEARCH

The planner searches a declared grid and reports what it actually established.

Known busy state and hard rules remove invalid positions. The remaining candidates are ordered deterministically, and the search assessment says whether the declared grid was exhausted.

TECHNICAL DETAIL

The browser renders generated Rust results. PROVEN_OPTIMAL applies only to the declared discrete grid after full traversal with a solution; candidate limits reduce the assessment to BEST_FOUND.

01
Declare the searchable windowScope + grid
02
Compile known blocking stateContext snapshot
03
Evaluate discrete positionsCandidate search
04
Reject invalid candidatesHard validity
05
Order valid candidatesResult + assessment

A three-hour search field shows a known busy block, deterministic grid positions, evaluated candidates and the selected candidate. A proof strip states outcome and assessment from Rust output.

REALDeterministic Planning Field
SEARCH SPACE09:00 → 12:00 UTCThe planner may only choose inside this window.
ASSESSMENTProvenOptimalRust planner claim for this bounded run
blockedfeasible candidateselected resultdiscrete grid
09:0010:0011:0012:00
KNOWN BUSY09:00—10:00
C110:00
C210:15
C310:30
C410:45
C511:00
C611:15
C711:30
OUTCOMESolution
FEASIBLE7candidates remain valid
SELECTED10:00 UTCchosen deterministically
AUTHORITYRust core outputrendered, not recomputed
Text alternative

A three-hour search field shows a known busy block, deterministic grid positions, evaluated candidates and the selected candidate. A proof strip states outcome and assessment from Rust output.

Built from current repository facts or Rust-generated fixture output.
CORE / RESULT
CURRENT CORE RESULT

ProvenOptimal

The value above is generated by running the Rust core example during the website build.

Read ADR-0006→